Feed Back
|
Site Map
Contact Us
Enquiry
Site Map
Performance Evaluvation Sheet
History Sheet
Associates
Name
Email
Leakage
Does the APH is currently having higher leakage:
Yes
No.
Current percentage of leakage:
Whether MW generation is reduced due to fan loading:
Yes
No.
Fouling
Pressure drop increase in one year of operation:
Higher fouling is noticed on :
Hot End
Hot Intermediate
Cold End
After water washing, do you drive out the water by running the fan
Yes
No
Type of fouling:
Dry
Wet
Soot Blower
Type of soot blower provided:
Swing Arm
Retractable
Soot blower provided at :
Hot End
Cold End
Both Ends
Soot blower steam blowing pressure:
Soot blower steam temperature:
Frequency of operation per day :
Steam Coil Air Preheater (SCAPH)
Provision of SCAPH:
Yes
No.
In Operation :
Yes /
No.
Installation of SCAPH:
Vertical
Horizontal
Pressure drop across SCAPH:
Erosion
Erosion damage
High
Low
Parts Eroded
Depth of heating element eroded
Rotor Drive
Drive HP
Rotor RPM
Type of Emergency Drive
Auxiliary Equipment
Rotation Monitor Installed:
Yes
No
Fire Sensing Device:
Yes /
No.
Type of Fire Sensing Device:
Thermocouple
Infrared
Disclaimer |Privacy Policy |Feedback |
Site Map
| Copy Right 2011- GEECO Enercon Pvt. Limited.