News & Events 3

2,00,000 BASKETS

GEECO is surpassing the manufacturing of 2,00,000 baskets and leads the Air Preheater market by achieving this milestone in 2021.


7th INTERNATIONAL SEMINAR – 2019

Successfully organized the ‘Seventh International Seminar’ on APH & ESP for the Customers across the Globe under the theme “TECHNOLOGIES FOR BETTER GENERATION” on 18th & 19th July, 2019


PJB CONNECT 2019 – SURABAYA

Participated in PJB CONNECT 2019 held in Surabaya – Indonesia exhibiting our new technologies and developments in APH & ESP for local government & private officials.


POWERGEN ASIA 2019 – MALAYSIA

Participated in POWERGEN ASIA 2019 held in Malaysia exhibiting our new technologies and developments in APH & ESP


R&D CENTRE

GEECO’s Research and Development center has been recognized and registered by Department of Scientific and Industrial Research (DSIR), Ministry of Science & Technology, Government of India on 28th March 2019.


EEPC AWARDS

GEECO received consecutive awards from EEPC (Engineering Export Promotion Council) of India for Excellent Performance on Exports from 2006 – 2017.


1,00,000 BASKETS

GEECO manufactured 1,00,000 baskets and we are the second company in INDIA to achieve this milestone on 2016.


6th INTERNATIONAL SEMINAR -2016

Successfully organized the ‘Sixth International Seminar’ on APH & ESP for the Customers across the Globe under the theme “SAVE ENERGY! SAVE ENVIRONMENT! SAVE EARTH!” on 22nd & 23rd February, 2016.


MAIDEN ENTRY – VIETNAM

Extended our wings in VIETNAM by capturing First Order from M/s. NARIME & completed to their utmost satisfaction on May 2016.


PJB CONNECT 2016 – SURABAYA

Actively participated in International Seminar organized by PJB Connect-2016 in Indonesia during 24th & 25th October 2016 & had a close interaction with participants across the globe by briefing current strength and capabilities.


R&M @ TTPS-UNIT #2

Bagged another Renovation & Modernization order in Unit #2 (210 MW) during October 2016 from M/s. Tuticorin Thermal Power Station (TANGEDCO), Tamil Nadu on 2009.


GAS TO GAS HEATER

A new benchmark in project execution by bagging their First Gas to Gas Heater order from M/s. Tata Power Trombay Thermal Power Station and Erected and Commissioned successfully on 2015.


IFFCO, PHULPUR

Have achieved another milestone by successfully completing the mechanical erection work of Rotary Air Preheater in Boiler #1 (125 TPH) at M/s. IFFCO, Phulphur on 2015.


NALCO, DAMANJODI

Executed a contract for M/s. NALCO LTD, Damanjodi, for replacement of existing APH with New APH, involving ‘Field Study, Design, Manufacture, Supply, Erection, Supervision and Commissioning of APH Size 22 VIR 1600 to their entire satisfaction on September 2015.


R&M @ MTPS-UNIT #1

Successfully completed the Renovation and Modernization of APH’s at Mettur Thermal Power Station, (Unit #1), TANGEDO, Mettur, Tamil Nadu and guaranteed parameters were achieved on September 2015.


ROTOR ASSEMBLY

Successfully Manufactured 4 Nos. Of Rotor Assembly for 660 MW Units in which three parties (BWE, BGR & NTPC) conducted, Stage and Final Inspections on APR 2015.


5th INTERNATIONAL SEMINAR-2014

We have successfully organized the Fifth International Seminar on “Regenerative Air Preheater” at Tiruchirappalli, India on 27th and 28th of February 2014.


ELECTROSTATIC PRECIPITATOR

Proud to announce that we are in the field of ELECTROSTATIC PRECIPITATOR and focus to provide excellent engineering/technical services and supply quality equipment/spares to our customers on 2014


GEECO FACTORY UNIT #2

An Additional Plant (Unit-II) with 4 acres of land with a covered Shed of 7,040 Sq.Ft is under operation on 2014.


MODIFICATIONS (GUIDE BEARING ASSEMBLY)

Successfully completed the Guide Bearing Modifications at Overseas for 500 MW & 700 MW Units from the original Design of OEM to increase the realibility of Operation.


MODIFICATIONS (SUPPORT BEARING ASSEMBLY)

Successfully completed the SUPPORT BEARING ASSEMBLY conversion from Kingsbury type to spherical roller bearing type at Tata Power (Trombay Thermal Power Station – 500 MW) on October 2014.


R&M @ TTPS-UNIT #3

GEECO successfully completed the Renovation and Modernization of APH’s at Tuticorin Thermal Power Station, Tamil Nadu for Unit #3, Unit #4, Unit #5 and the Performance Guarantee was met as per the Customer Requirement on 2013.


SUPPORT BEARING ASSEMBLY

Successfully completed the SUPPORT BEARING ASSEMBLY conversion from Kingsbury type to spherical roller bearing type at Tata Power (Trombay Thermal Power Station – 500 MW) on 28th October 2014.


TATA POWER, TROMBAY

Supplied Complete Gear Box Assembly for Tata Power Trombay (500 MW) Unit on 17th December 2014.


INTEGRATED MANAGEMENT SYSTEM (IMS)

First company in India accredited for the Integrated Management System (IMS) Certificate in the year 2013 comprising ISO 9001 (QMS), ISO 14001 (EMS), BS OHSAS 18001, and ISO 50001 (EnMS).


MAIDEN ENTRY – USA

Supplied First Consignment of Air preheater spares to USA on 2012.


HINDALCO, RENUSAGAR

Bagged “Appreciation for Exceptional Contribution” award from M/s. Hindalco Industries (Renusagar Power) India on 2011.


MANUFACTURING – AUTOMATION

Successfully commissioned an automation line for “Heating Element” manufacturing for increasing productivity and meeting customers short term delivery schedule on 2011.


BALCO, KORBA

Secured major conversion order from M/s. BALCO, Korba, Chhattisgarh for Unit 1,3 &4 each of 135 MW Capacity on 2010.


GEECO FACTORY UNIT #1

New Plant (Unit-I) with modern facilities and 70,000 sq.ft of covered Shed-I and 47,740 sq.ft of covered Shed-II constructed in 18 acres land on 2010.


MAIDEN ENTRY – KUWAIT

GEECO successfully supplied, installed and commissioned HIGH PRESSURE CLEANING SYSTEM at MEW Kuwait on 2009.

MAIDEN ENTRY – PAKISTAN

Secured Maiden Order from PEPCO, Pakistan for the supply of Heating Elements and Seals on 2009.


COMMITMENT TO QUALITY

The committed Performance Guarantee is proved and validated by conducting the test at NTPC Talcher – 110 MW on 2007.