Field Engineering

Field Engineering

We provide recommendations based on our Technical assessment on various causes as listed below in existing ESP, irrespective of its design, to improve performance and meet stringent pollution control norms.

a. Fundamental cause – Includes gas stream characteristics like flow volume, change in dust properties, overall design inadequacies, Inadequate or unstable energization.

b. Mechanical cause – Condition of internals, Improper design or construction, inadequate rapping intensity.

c. Operational cause – Process upset, Inadequate power input, failure of transformer

Overhauling

GEECO posses necessary expertise and competency in assistance, supervision and execution in overhauling works of an Electrostatic Precipitator in an operating plant with activities like water washing, repair of internals, health check of components like TR Set, rapping motors / rapper coils, etc.,